After every AI news, the reporter learned from the State Grid Shanxi Electric Power Company that at 18: 50 on December 19, the power supply of 56 transmission lines in Yuanqu Power Grid and the power supply of emergency power vehicles were all switched, and the production and living electricity consumption of residents in Yuanqu County was all restored. The 133 emergency power vehicles mobilized by the State Grid from Hebei, Sichuan, Anhui and other places will all return on the morning of the 20th. (CCTV News)
关于作者